LSTK PACKAGE-3 (JETTY Pipeline and associated facilities) for Ethylene Glycol Project at Paradip Refinery, Paradip, Odisha- for M/s. Indian Oil Corporation Ltd., Pipelines Division – 20” SS Pipe of 10 Km’s.
Supply, Fabrication, Erection, Installation, Testing, Cold Insulation, Painting, Pre-commissioning, and Commissioning of 16’’ Dia. each Propane and Butane Cross Country Pipelines from Jetty to NGC Refrigerated LPG Import Terminal at Adani Krishnapatnam Port, Andhra Pradesh, India – M/s. Petregaz NGC Energy India Pvt. Ltd – 16” OD A-333- 6.35 Km’s
Laying 30” OD, 117.00 Km (Approx.) Cross Country R-LNG Pipeline from Ennore RLNG Terminal to IP 101 (Palliyagram) & 6.625” OD, 26.00 KM (approx.) Spur lines and Combined Station works for associated sectionalizing valve station, Receiving terminals & Dispatch terminal
Laying of Cross Country R-LNG pipeline from IP-101 (Palliyagram) to IP 105 (Ramanthapuram) & Tehran Jonoob Technical & Construction Co. Gujarat- 30” OD – 59.64Kms & 24”OD – 72.85Kms
Fabrication & Erection Of Underground Pipeline From BPCL Ennore Coastal Installation To Ennore Tank Terminal Pvt. Ltd. At Ennore, Tamilnadu for M/s. Bharat Petroleum Corporation Limited, 24” OD Twin pipeline – 17.62KM
Mainline works from Chennai Port to CPCL Refinery, Composite Station works at Scrapper Launching Area and Composite Station Works at Scrapper Receiving Area- for M/s. Indian Oil Corporation Ltd., Pipelines Division, 42” OD -12300 mtrs
Laying 20”/14”/12” OD petroleum product pipeline in Railway corridor from IOCL – Korrukupet Terminal to Chennai Port Trust and combined station works of Mechanical, Civil & electrical works and Other facilities at Korrkupet terminal and Chennai Port Trust Group A M/s. Indian Oil Corporation Ltd., Pipelines Division,– 20”/14”/12” OD – 5500 m Each in a single trench